Perencanaan unit pengolahan lumpur di intalasi pengolahan air minum x Kota Surabaya

Rahayu, Septiya Rini and Pribadi, Arqowi and Nengse, Sulistiya and Setyowati, Rr Diah Nugraheni and Utama, Teguh Taruna (2020) Perencanaan unit pengolahan lumpur di intalasi pengolahan air minum x Kota Surabaya. Jurnal Teknologi Technoscientia, 13 (1). pp. 76-82. ISSN 1979-8415; 2714-8025

[thumbnail of Rr Diah Nugraheni S_Perencanaan unit pengolahan lumpur.pdf] Text
Rr Diah Nugraheni S_Perencanaan unit pengolahan lumpur.pdf - Published Version

Download (882kB)

Abstract

Sludge of water treatment plant which contains aluminum if discharged directly into the water will be toxic. Due to not having a sludge treatment unit, water treatmet plantX dumped sludge from processing to the Surabaya River. In planning the stages of selecting alternative treatment units, the units will be selected to process sludge consisting of collecting tanks, gravity thickening, beltfilter press, sludgefiltrate storage tanks, supernatant tanks and dry cakestorage containers. The amount of sludge volume produced by IPAM is 5875.475 m3/ day with anestimated procurement cost of Rp 3,857,000,000.

Item Type: Article
Creators:
Creators
Email
["eprint_fieldname_creators_NIDN" not defined]
Rahayu, Septiya Rini
septiyarini96@gmail.com
UNSPECIFIED
Pribadi, Arqowi
arqowi.pribadi@uinsby.ac.id
2003018701
Nengse, Sulistiya
sulistiya@uinsby.ac.id
0709109001
Setyowati, Rr Diah Nugraheni
nugraheni_diah@yahoo.com
UNSPECIFIED
Utama, Teguh Taruna
utama.teguh87@gmail.com
UNSPECIFIED
Uncontrolled Keywords: Belt filter press; WTP; sludge treatment
Subjects: 05 ENVIRONMENTAL SCIENCES > 0502 Environmental Science and management > 050299 Environmental Science and Management not elsewhere classified
Divisions: Karya Ilmiah > Artikel
Depositing User: desiana ekasari
Date Deposited: 22 Nov 2021 08:56
Last Modified: 22 Nov 2021 09:04
URI: http://repository.uinsa.ac.id/id/eprint/1823

Actions (login required)

View Item
View Item